Describe the source and demand
Provide the intake method, available salinity or TDS, temperature range and turbidity data. Explain daily demand, peak variation and intended use. List unknowns for subsequent testing.
Describe the site
Include power supply, available space, transport and lifting access, operators and target delivery date. Remote sites also require consideration of spare parts and service access.
Determine the configuration from water quality
SW24A, SW200 and SW500 are system series codes. The numbers alone do not establish on-site production. Confirm production, energy and equipment against feed analysis and engineering design.
Based on company desalination and site-requirement materials. This guide supports project discussions; model-specific controlled technical documents and engineering design remain the basis for implementation.