Process arrangement
Seawater intake → raw water tank → pretreatment → first-pass RO → second-pass RO → product water.
Source pressure references: 60 bar for the high-pressure stage and 15 bar for the low-pressure stage.
Skid-mounted
Skid-Mounted Seawater Desalination
A compact seawater desalination skid combining pretreatment and two-stage reverse osmosis.
Start with your water quality report or project information. No sample shipment is needed for an initial enquiry.

TECHNICAL REFERENCE
| Parameter | Reference value |
|---|---|
| Configuration | Pretreatment + two-stage RO |
| Rated product water | 1.0 m³/h |
| Rated feedwater | 2.7 m³/h |
| Specific energy at rated conditions | 6.6 kWh/m³ |
| Rated / installed power | 6.5 kW / 8 kW |
| Design pressure | 60 bar (HP) / 15 bar (LP) |
| RO elements | 11 × 4040 seawater elements |
| Dimensions (L × W × H) | 185 × 150 × 180 cm |
| Empty weight | 658 kg |
Source: supplied SNANO product materials, 28 October 2026 edition. Rated values refer to the source design conditions; a complete design feedwater analysis is not included in the archive. Confirm site production, energy use and equipment from the water analysis and engineering design. Model codes do not directly specify daily capacity.
SELECTION & APPLICATION
For projects considering compact water supply on islands, at resorts, on vessels or at remote sites. These are application directions, not operating references or customer cases.
Seawater intake → raw water tank → pretreatment → first-pass RO → second-pass RO → product water.
Source pressure references: 60 bar for the high-pressure stage and 15 bar for the low-pressure stage.
Seawater inlet, product water outlet, concentrate outlet, cleaning water inlet and raw water tank inlet.
Confirm intake, discharge, storage, access and utilities in the site design.
Share available power, operating hours, maintenance resources and seasonal demand. A modular DC microgrid is an optional integration to assess for the project.
Explore the optional microgridSTART FROM ANYWHERE
Provide your available water analysis, treatment target, capacity and country. If you have no report yet, describe the source and project first.
A report supports initial screening. Additional local analysis, agreed sample testing or an on-site pilot may be needed to assess separation, fouling and long-term operation.
Start with an existing water analysis or describe your project. Agree the next step before arranging any sample shipment.